ERGOTIME v8
Production Line Balance
Graphic tool available to easily simulate assembling line organization regarding to the workforce and the takt time wanted.

Production line balance shown by Gantt Graph and modifications dynamically done by Drag’n Drop.
 
 
 
 
Balance loss, units per hour and Takt time calculated in the instant.
Industrial Engineering Experts
Training, Consulting & Audits
Lean Manufacturing & Ergonomics
Ergotime®
Copyright © 2017 by Ergotime Stv  ·  All Rights reserved  ·  E-Mail: contact@ergotime.com